NWDNorwood Junction
Take a position on the services calling at Norwood Junction — whether each one runs to time, at a price that moves until it does. Every market settles from the same official board the station publishes.
Who calls at Norwood Junction
The operators with markets at this station, by how many they run. Each links to its own on-time record across the whole network.
- SN4 departing · 4 arriving
Live board
Board not reportedNo trains are published on this side of the board today.
Departures from Norwood Junction
Nothing trading in this direction right now.
Arrivals at Norwood Junction
Nothing trading in this direction right now.
Reachable from here
Stations at the other end of a service with a market at Norwood Junction. Each has a page of its own.
How settled services went
Every settled market at Norwood Junction, by the result it settled to. Market history, not an operator statistic.
Departures
4Share of the last 4 settled markets on GADUIN, by settled outcome. Market history, not an operator statistic.
Arrivals
4Share of the last 4 settled markets on GADUIN, by settled outcome. Market history, not an operator statistic.
Recently settled
The last 8 Norwood Junction markets to settle, each with the date trading closed and the result it settled to.
- Will 2S94 SN (London Victoria → Norwood Junction) arrive on time, be delayed, or be cancelled on Saturday 12 September? Delayed means 5 minutes or more late.Closed Sep 13, 2026On time
- Will 2S92 SN (London Victoria → Norwood Junction) arrive on time, be delayed, or be cancelled on Saturday 12 September? Delayed means 5 minutes or more late.Closed Sep 13, 2026On time
- Will 2S90 SN (London Victoria → Norwood Junction) arrive on time, be delayed, or be cancelled on Saturday 12 September? Delayed means 5 minutes or more late.Closed Sep 12, 2026On time
- Will 2H91 SN (London Bridge → Norwood Junction) arrive on time, be delayed, or be cancelled on Saturday 12 September? Delayed means 5 minutes or more late.Closed Sep 12, 2026On time
- Will 2H94 SN (Norwood Junction → London Bridge) arrive on time, be delayed, or be cancelled on Saturday 12 September? Delayed means 5 minutes or more late.Closed Sep 12, 2026On time
- Will 2H92 SN (Norwood Junction → London Bridge) arrive on time, be delayed, or be cancelled on Saturday 12 September? Delayed means 5 minutes or more late.Closed Sep 12, 2026On time
- Will 2S95 SN (Norwood Junction → London Victoria) arrive on time, be delayed, or be cancelled on Saturday 12 September? Delayed means 5 minutes or more late.Closed Sep 12, 2026On time
- Will 2S93 SN (Norwood Junction → London Victoria) arrive on time, be delayed, or be cancelled on Saturday 12 September? Delayed means 5 minutes or more late.Closed Sep 12, 2026On time
GADUIN publishes prediction markets on public transport events. Prices are what people here are paying for an outcome at Norwood Junction, not a forecast from the railway, and nothing here is a timetable.